Your ultimate defence against corrosion. Follow our expert guidelines to ensure long-lasting protection for every surface.

Steel Storage Tanks

Ensure surfaces are degreased and free of contamination using Protective Paints A925 – Metal degreaser (follow instructions as per data sheet). Ensure all Corroless data sheet are strictly followed. Ensure surfaces are free from preparation debris and are clean and dry. Apply 1st coat within 4 hours of abrasive blasting. Practical coverage is project dependent.
All data sheets can be found at the back of this manual.

Exterior Moderate exposure

Abrasive Blasting Sa 2½ of AS 1627.4 (Two pack system)

1st Coat
Apply Corroless E at 80 µ WFT (50 µ DFT)
2nd and 3rd coat
Apply Corroless RF 60 at 50 µ WFT ( 30 DFT) tinted to approved colour
TDF = 110 microns minimum
External Exposure and chemicals

Less Than 10 km from coastal areas of industrial activity
Abrasive Blasting Sa 2½ of AS 1627.4 (Two pack system)

1st Coat

Apply Corroless EPF at 210 µ WFT( 200 µ DFT)

2nd and 3rd coat
Apply Corroless RF 60 at 50 µ WFT ( 30 DFT) tinted to approved colour
TDF = 260 microns minimum
Internal Metal Tanks Heavy Duty

Tank Lining of
Abrasive Blasting Sa 2½ of AS 1627.4 (Two pack system)

1st Coat

Apply Corroless EPF at 210 µ WFT( 200 µ DFT)

2nd and 3rd coat

Apply Corroless RF 35 at 210 µ WFT ( 200 DFT)

TDF = 600 microns minimum