Your ultimate defence against corrosion. Follow our expert guidelines to ensure long-lasting protection for every surface.

Steel Pipes

Surface Preparation: Ensure surfaces are degreased and free of contamination using Protective Paints A925 – Metal degreaser (follow instructions as per data sheet). Ensure surfaces are free from preparation debris and are clean and dry. Ensure all Corroless data sheets are followed.Apply 1st coat within 4 hours of abrasive blasting. Practical coverage is project dependent. All data sheets can be found at the back of this manual.

Steam pipes @ 200°C

Abrasive Blasting Sa 2½ of AS 1627.4 (Two pack system)

1st Coat
Apply Corroless E at 80 µ WFT (50 µ DFT)
2nd and 3rd coat
Apply Corroless RF 60 at 50 µ WFT ( 30 DFT) tinted to approved colour
TDF = 110 microns minimum
External Exposure and chemicals 5-10+ year durability

Less Than 10 km from coastal areas of industrial activity
Abrasive Blasting Sa 2½ of AS 1627.4 (Two pack system)

1st Coat

Apply Corroless EPF at 210 µ WFT( 200 µ DFT)

2nd and 3rd coat
Apply Corroless RF 60 at 50 µ WFT ( 30 DFT) tinted to approved colour
TDF = 260 microns minimum
Buried/ Immersion and Abrasion

Abrasive Blasting Sa 3 of AS 1627.4 (Two pack system)

1st Coat

Apply Corroless EPF at 80 µ WFT (50 µ DFT)

2nd and 3rd coat
Apply Corroless RF 60 at 50 µ WFT ( 30 DFT) tinted to approved colour
TDF = 110 microns minimum
Specification subject to NZS/AS 1627; Preparation of surfaces NZS/AS 2312 Protection of mild steel; AS 3894 Determination of Dry Film thickness